Abstract
Energy storage scheduling is optimised for a CST tower plant for two values of heliostat optical error. Different storage schedules are observed between these cases. Optimal scheduling reduces losses associated with poor optics.
© 2016 Optical Society of America
PDF ArticleMore Like This
Lifeng Li, John Pye, and Wojciech Lipiński
RTu3C.3 Optics for Solar Energy (SOLED) 2015
Lars Amsbeck, Reiner Buck, and Tobias Prosin
RTu3C.5 Optics for Solar Energy (SOLED) 2015
Lifeng Li, John Pye, and Wojciech Lipiński
OW3D.6 Optics for Solar Energy (SOLED) 2018